55 t/day Municipal Sludge Composting Facility

A membrane composting facility configured for 55 tonnes of municipal sludge per day, blending sludge with bulking material and finishing it as compost.

Municipal wastewater sectorMunicipal sewage sludge
Municipal sludge composting facility equipment
55 t/day

Configured sludge treatment capacity

Continuous

Intake matched to plant operation

The challenge

The wastewater plant needed a continuous, defensible sludge route. Intake could not pause, odour had to stay controlled, and the output needed a defined landscaping channel.

The system

Sludge is received, blended to recipe, fermented in membrane-covered lanes with automated aeration, then cured and screened. The line layout separates sludge intake, fermentation and finished-product zones.

The outcome

The facility runs sludge treatment as a continuous production process with a compost output, instead of a disposal contract with rising cost and tightening acceptance.

Back to all cases

Zhalantun, Hulunbuir, Inner Mongolia

Zhalantun Regional Organic-Waste Processing Center

View case
Hohhot, Inner Mongolia

Hohhot Dairy Manure-to-Bedding Project

View case
Hezhou, Guangxi

Small Pig Farm Membrane Composter Pilot

View case

A similar stream, a similar answer

If your material and scale resemble this project, the scoping is already half done. Send your volume and location and the team will map the differences.