Peninsula Xingu Industrial Park, Mizhou Street, Zhucheng City, Shandong Province, Chinaservice@jiesonglin.com  ·  +86 134 5568 9550
Case Study

Hohhot Dairy Manure-to-Bedding Project

Membrane composting of dairy manure with the treated solids returning to the farm as hygienic bedding — a circular system documented in project photography from the site.

Hohhot, Inner MongoliaDairy cattle manure
Dairy manure composting project site in Hohhot
3,000-head

Dairy herd scale published on the previous website — carried over from the previous website, re-confirmation in progress

Closed loop

Manure to bedding and fertilizer

The challenge

A large dairy operation produces manure continuously and buys bedding continuously. Treating the two flows as one system turns a disposal cost into an on-farm material loop.

The system

Manure is collected, fermented under membrane cover with controlled aeration, and the stabilised solids fraction is prepared for return as cubicle bedding, with remaining output going to fertilizer use.

The outcome

The project demonstrates the manure-to-bedding loop at working scale: waste volume leaves the farm as product or returns as bedding, and the treatment area stays contained and managed.

What this case means for your project

For dairy operators evaluating their own project: this case is a cow manure composting system with a second output decision built in. The bedding loop changes the economics of the manure line, because part of the treated output displaces a purchased input. When scoping a similar project, confirm early whether the bedding return is part of the design — it affects the curing and preparation stages downstream of fermentation.

Back to all cases

Zhalantun, Hulunbuir, Inner Mongolia

Zhalantun Regional Organic-Waste Processing Center

View case
Municipal wastewater sector

55 t/day Municipal Sludge Composting Facility

View case
Hezhou, Guangxi

Small Pig Farm Membrane Composter Pilot

View case

A similar stream, a similar answer

If your material and scale resemble this project, the scoping is already half done. Send your volume and location and the team will map the differences.

Start an InquiryWhatsApp Us